Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction

Introduction:


Product Detail

Product Tags

Related Video

Feedback (2)

We always do the job to be a tangible group making sure that we can provide you with the top top quality as well as ideal value for Dozer Blade, Bucket Tooth, Excavator Grab Bucket, Welcome you to join us together to make your business easier. We are always your best partner when you want to have your own business.
Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction Detail:

1. The perfect combination between energy-conservation drive system and low speed energy-conservation engine builds the one and only 3t energy-conservation product in the industry, with the economy superior by >10% to the industry’s like products.

2. The transmission is applied with the optimal lubrication system design technology to thoroughly improve the industry’s difficulties of insufficient and non-uniform transmission lubrications and make the transmission life remarkably leading the industry.

3. With the application of the exclusive high strength single plate beam skeleton structure, the “load-carrying material ratio” is remarkably leading the industry products.

4. The extended wheelbase and the classic 3rd generation loader structure realize higher working capacity, smaller turning radius, and lower wear of rear wheels.

Log clamp I/ Log clamp IV (offset tooth)/ Toad’s mouth clamp/ Paired and Staggered inter-convert/ Grasping grass machine/ Pallet fork/ Snowplow.

Description

Unit

Parameter value

Rated operating load

kg

3000

Bucket capacity

1.5~2.5

Machine weight

kg

10900±200

Dump clearance at maximum lift

mm

2770~3260

Reach at maximum lift

mm

1010~1210

Wheel base

mm

2900

Tread

mm

1850

Height of hinge at maximum lift height

mm

3830

Working height(fully lifted)

mm

4870

Max.breakout force

kN

130

Max.horse power

kN

95

Hydraulic cycle time-raise

s

5.4

Total hydraulic cycle time

s

9.3

Min. turning radius over tyres

mm

5170

Articulation angle

°

38±1

Gradeability

°

28

Tyre size

17.5-25-12PR

Overall machine dimension L×W×H

mm

7245×2482×3320

Model

WP6G125E201

Emission standards

Emission 2

Rated Power/Speed

kW/rpm

92/2000

Fuel Tank

L

170

Hydraulic Tank

L

175


Product detail pictures:

Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction detail pictures

Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction detail pictures

Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction detail pictures

Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction detail pictures

Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction detail pictures

Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction detail pictures


Related Product Guide:

Good quality comes initial; company is foremost; small business is cooperation" is our business philosophy which is frequently observed and pursued by our business for Good User Reputation for Electric Front End Loader - XCMG 3 ton LW300KN Front Wheel Loader – China Construction , The product will supply to all over the world, such as: Hanover, Danish, Ethiopia, If you need to have any of our merchandise, or have other items to be produced, make sure you send us your inquiries, samples or in depth drawings. Meanwhile, aiming to develop into an international enterprise group, we look forward to receiving offers for joint ventures and other cooperative projects.
  • Goods just received, we are very satisfied, a very good supplier, hope to make persistent efforts to do better.
    5 Stars By Caroline from Peru - 2017.09.30 16:36
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Mary from Karachi - 2018.05.13 17:00
    Write your message here and send it to us