Rapid Delivery for Front Loader Construction - XCMG 3 ton LW300KN Front Wheel Loader – China Construction
Rapid Delivery for Front Loader Construction - XCMG 3 ton LW300KN Front Wheel Loader – China Construction Detail:
1. The perfect combination between energy-conservation drive system and low speed energy-conservation engine builds the one and only 3t energy-conservation product in the industry, with the economy superior by >10% to the industry’s like products.
2. The transmission is applied with the optimal lubrication system design technology to thoroughly improve the industry’s difficulties of insufficient and non-uniform transmission lubrications and make the transmission life remarkably leading the industry.
3. With the application of the exclusive high strength single plate beam skeleton structure, the “load-carrying material ratio” is remarkably leading the industry products.
4. The extended wheelbase and the classic 3rd generation loader structure realize higher working capacity, smaller turning radius, and lower wear of rear wheels.
Log clamp I/ Log clamp IV (offset tooth)/ Toad’s mouth clamp/ Paired and Staggered inter-convert/ Grasping grass machine/ Pallet fork/ Snowplow.
Description |
Unit |
Parameter value |
Rated operating load |
kg |
3000 |
Bucket capacity |
m³ |
1.5~2.5 |
Machine weight |
kg |
10900±200 |
Dump clearance at maximum lift |
mm |
2770~3260 |
Reach at maximum lift |
mm |
1010~1210 |
Wheel base |
mm |
2900 |
Tread |
mm |
1850 |
Height of hinge at maximum lift height |
mm |
3830 |
Working height(fully lifted) |
mm |
4870 |
Max.breakout force |
kN |
130 |
Max.horse power |
kN |
95 |
Hydraulic cycle time-raise |
s |
5.4 |
Total hydraulic cycle time |
s |
9.3 |
Min. turning radius over tyres |
mm |
5170 |
Articulation angle |
° |
38±1 |
Gradeability |
° |
28 |
Tyre size |
17.5-25-12PR |
|
Overall machine dimension L×W×H |
mm |
7245×2482×3320 |
Model |
WP6G125E201 |
|
Emission standards |
Emission 2 |
|
Rated Power/Speed |
kW/rpm |
92/2000 |
Fuel Tank |
L |
170 |
Hydraulic Tank |
L |
175 |
Product detail pictures:
Related Product Guide:
We attempt for excellence, support the customers", hopes to become the top cooperation team and dominator enterprise for staff, suppliers and shoppers, realizes worth share and continual marketing for Rapid Delivery for Front Loader Construction - XCMG 3 ton LW300KN Front Wheel Loader – China Construction , The product will supply to all over the world, such as: Chile, Malawi, Adelaide, Since the establishment of our company, we've realized the importance of providing good quality goods and the best before-sales and after-sales services. Most problems between global suppliers and clients are due to poor communication. Culturally, suppliers can be reluctant to question points they do not understand. We break down these barriers to ensure you get what you want to the level you expect, when you want it.
By Sarah from Spain - 2017.04.08 14:55
Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
By Harriet from Greece - 2017.04.18 16:45